Maplewell Post 16, Loughborough

One of the Secure-a-Field install teams has recently completed work at Maplewell Post 16 Centre, converting a former ball court to a carpark with vehicle/ pedestrian segregation.

Works on this project included the supply and installation of the following:

  • 1200mm high Pedestrian Guardrail, powder coated yellow to enhance visibility.
  • 60 mtr yellow Vehicle Parking Bollards, spaced at 2.5 mtrs.
  • Cutting and removing 5mtr of existing ballcourt fencing to install 2x Manual Rising Arm Barriers, including casting 4 x concrete base foundations.
  • 30 mtr Defender 8T green mesh fencing
  • A single leaf Pedestrian Gate, 1800mm high x 1200mm width.
Date
Wed, 1 Mar 2023
Project
Maplewell Post 16
Author
D Bedford
Publisher
DRB
Tags
  • 1200mm Pedestrian Guardrail Powder coated Yellow

  • Defender 8T Mesh Fencing Green 1800mm Height

  • Vehicle Parking Bollards, Powder coated Yellow

  • Manual rising arm barrier